The Airbus A380 is a double-deck, wide-body, four-engine airliner manufactured by the European corporation Airbus, an EADS subsidiary.

The Airbus A380 is a double-deck, wide-body, four-engine airliner manufactured by the European corporation Airbus, an EADS subsidiary. The largest passenger airliner in the world, the A380 made its maiden flight on 27 April 2005 from Toulouse, France, and made its first commercial flight on 25 October 2007 from Singapore to Sydney with Singapore Airlines. The aircraft was known as the Airbus A3XX during much of its development phase, but the nickname Superjumbo has since become associated with it.



The A380's upper deck extends along almost the entire length of the fuselage, and its width is equivalent to that of a widebody aircraft. This allows for a cabin with 50% more floor space than the next-largest airliner, the Boeing 747-400. and provides seating for 525 people in standard three-class configuration or up to 853 people in all economy class configurations. The A380 is offered in passenger and freighter versions. The A380-800, the passenger model, is the largest passenger airliner in the world, but has a shorter fuselage than the Airbus A340-600, which is Airbus's next-biggest passenger aeroplane. The A380-800F, the freighter model, is offered as one of the largest freight aircraft, with a listed payload capacity exceeded only by the Antonov An-225. The A380-800 has a design range of 15,200 km (8,200 nmi), sufficient to fly from Boston to Hong Kong for example, and a cruising speed of Mach 0.85 (about 900 km/h or 560 mph at cruising altitude). It is the first commercial jet capable of using GTL-based fuel.

Development

In the summer of 1988, a group of Airbus engineers, led by Jean Roeder, began working in secret on the development of a ultra-high-capacity airliner (UHCA), both to complete its own range of products and to break the dominance that Boeing had enjoyed in this market segment since the early 1970s with its 747.[9] McDonnell Douglas unsuccessfully offered its smaller, double-deck MD-12 concept for sale. As each manufacturer looked to build a successor to the 747, they knew there was room for only one new aircraft to be profitable in the 600- to 800-seat market segment. Each knew the risk of splitting such a niche market, as had been demonstrated by the simultaneous debut of the Lockheed L-1011 and the McDonnell Douglas DC-10: Both planes met the market’s needs, but the market could profitably sustain only one model, eventually resulting in Lockheed's departure from the civil airliner business.

Roeder was given approval for further evaluations of the UHCA after a formal presentation to the President and CEO in June 1990. The project was announced at the 1990 Farnborough Air Show, with the stated goal of 15% lower operating costs than the 747-400. Airbus organized four teams of designers, one from each of its EADS partners (Aérospatiale, DaimlerChrysler Aerospace, British Aerospace, EADS CASA) to propose new technologies for its future aircraft designs. The designs would be presented in 1992 and the most competitive designs would be used.

In January 1993, Boeing and several companies in the Airbus consortium started a joint feasibility study of an aircraft known as the Very Large Commercial Transport (VLCT), aiming to form a partnership to share the limited market.

In June 1994, Airbus began developing its own very large airliner, designated the A3XX. Airbus considered several designs, including an odd side-by-side combination of two fuselages from the A340, which was Airbus’s largest jet at the time. The A3XX was pitted against the VLCT study and Boeing’s own New Large Aircraft successor to the 747, which evolved into the 747X, a stretched version of the 747 with the fore body "hump" extended rearwards to accommodate more passengers. The joint VLCT effort ended in April 1995, and Boeing suspended the 747X program in January 1997. From 1997 to 2000, as the East Asian financial crisis darkened the market outlook, Airbus refined its design, targeting a 15 to 20 percent reduction in operating costs over the existing Boeing 747-400. The A3XX design converged on a double-decker layout that provided more passenger volume than a traditional single-deck design.

Design phase

On 19 December 2000, the supervisory board of newly restructured Airbus voted to launch a €8.8-billion programme to build the A3XX, re-christened as the A380, with 55 orders from six launch customers. The A380 designation was a break from previous Airbus families, which had progressed sequentially from A300 to A340. It was chosen because the number 8 resembles the double-deck cross section, and is a lucky number in some Asian countries where the aircraft was being marketed. The aircraft’s final configuration was frozen in early 2001, and manufacturing of the first A380 wing box component started on 23 January 2002. The development cost of the A380 had grown to €11 billion when the first aircraft was completed.

Boeing, meanwhile, studied multiple 747-400 derivative designs before finally launching the Boeing 747-8 in November 2005 (with entry into service planned for 2009). Boeing chose to develop a variant for the 400- to 500-seat market, instead of matching the A380's capacity.


Production

Geographical logistics sequence for the A380, with final assembly in Toulouse (map text in French).Major structural sections of the A380 are built in France, Germany, Spain, and the United Kingdom. Due to their size, they are brought to the assembly hall in Toulouse in France by surface transportation, rather than by the A300-600ST Beluga aircraft used for other Airbus models. Components of the A380 are provided by suppliers from around the world; the five largest contributors, by value, are Rolls-Royce, SAFRAN, United Technologies, General Electric, and Goodrich.


A380 transporter ship Ville de BordeauxThe front and rear sections of the fuselage are loaded on an Airbus Roll-on/roll-off (RORO) ship, Ville de Bordeaux, in Hamburg in northern Germany, from where they are shipped to the United Kingdom. The wings, which are manufactured at Filton in Bristol and Broughton in North Wales, are transported by barge to Mostyn docks, where the ship adds them to its cargo. In Saint-Nazaire in western France, the ship trades the fuselage sections from Hamburg for larger, assembled sections, some of which include the nose. The ship unloads in Bordeaux. Afterwards, the ship picks up the belly and tail sections by Construcciones Aeronáuticas SA in Cádiz in southern Spain, and delivers them to Bordeaux. From there, the A380 parts are transported by barge to Langon, and by oversize road convoys to the assembly hall in Toulouse.[ New wider roads, canal systems and barges were developed to deliver the A380 parts. After assembly, the aircraft are flown to Hamburg, XFW to be furnished and painted. It takes 3,600 l (950 US gal) of paint to cover the 3,100 m2 (33,000 sq ft) exterior of an A380.

Airbus sized the production facilities and supply chain for a production rate of four A380s per month

Testing

Five A380s were built for testing and demonstration purposes. The first A380, serial number MSN001 and registration F-WWOW, was unveiled at a ceremony in Toulouse on 18 January 2005. Its maiden flight took place at 8:29 UTC (10:29 a.m. local time) 27 April 2005. This plane, equipped with Trent 900 engines, flew from Toulouse Blagnac International Airport with a flight crew of six headed by chief test pilot Jacques Rosay. After successfully landing three hours and 54 minutes later, Rosay said flying the A380 had been “like handling a bicycle” .

On 1 December 2005, the A380 achieved its maximum design speed of Mach 0.96 (versus normal cruising speed of Mach 0.85), in a shallow dive, completing the opening of the flight envelope.

On 10 January 2006, the A380 made its first transatlantic flight to Medellín in Colombia, to test engine performance at a high altitude airport. It arrived in North America on 6 February, landing in Iqaluit, Nunavut in Canada for cold-weather testing.


A380 flying a banked turn at the ILA 2006 in Berlin, GermanyOn 14 February 2006, during the destructive wing strength certification test on MSN5000, the test wing of the A380 failed at 145% of the limit load, short of the required 150% to meet the certification. Airbus announced modifications adding 30 kg to the wing to provide the required strength.

On 26 March 2006, the A380 underwent evacuation certification in Hamburg, Germany. With 8 of the 16 exits blocked, 853 passengers and 20 crew left the aircraft in 78 seconds, less than the 90 seconds required by certification standards.

Three days later, the A380 received European Aviation Safety Agency (EASA) and United States Federal Aviation Administration (FAA) approval to carry up to 853 passengers.


Flight test engineer's station on the lower deck of A380 F-WWOW.The maiden flight of the first A380 using GP7200 engines—serial number MSN009 and registration F-WWEA—took place on 25 August 2006.

On 4 September 2006, the first full passenger-carrying flight test took place. The aircraft flew from Toulouse with 474 Airbus employees on board, in the first of a series of flights to test passenger facilities and comfort.

In November 2006, a further series of route proving flights took place to demonstrate the aircraft's performance for 150 flight hours under typical airline operating conditions.

Airbus obtained type certificate for the A380-841 and A380-842 model from the EASA and FAA on 12 December 2006 in a joint ceremony at the company's French headquarters The A380-861 model obtained the type certificate 14 December 2007.

As of February 2008[update], the five A380s in the test programme had logged over 4,565 hours during 1,364 flights, including route proving and demonstration flights.

Monday, February 18, 2008

www.ez2.me








Google




















Google














Saturday, January 19, 2008

A380









Delivery delaysInitial production of the A380 was plagued by delays attributed to the 530 km (330 miles) of wiring in each aircraft. Airbus cited as underlying causes the complexity of the cabin wiring (100,000 wires and 40,300 connectors), its concurrent design and production, the high degree of customisation for each airline, and failures of configuration management and change control.Deliveries would be pushed back by nearly two years.
While Airbus attributes the delays entirely to wiring, industry analyst Richard Aboulafia, noting that the first A380 will be around 5.5 tons heavier than intended, speculates that the weight problems a long way in explaining the delay", and that "wiring alone did not explain what we were all hearing. It sounds like weight-reduction design changes are a big part of the delay, too.
Airbus announced the first delay in June 2005 and notified airlines that delivery would slip by six months, with Singapore Airlines expecting the first A380 in the last quarter of 2006, Qantas getting its first delivery in April 2007 and Emirates receiving aircraft before 2008. This reduced the number of planned deliveries by the end of 2009 from about 120 to 90–100.
On 13 June 2006, Airbus announced a second delay, with the delivery schedule undergoing an additional shift of six to seven months. Although the first delivery was still planned before the end of 2006, deliveries in 2007 would drop to only 9 aircraft, and deliveries by the end of 2009 would be cut to 70–80 aircraft. The announcement caused a 26% drop in the share price of Airbus's parent, EADS, and led to the departure of EADS CEO Noël Forgeard, Airbus CEO Gustav Humbert, and A380 programme manager Charles Champion. In the wake of the new delay, Malaysia Airlines and ILFC were reported to be considering the cancellation of their orders. Launch customers Singapore Airlines, Emirates and Qantas also were reported to be angered by the delays and expecting compensation.However, on 21 July 2006, Singapore Airlines ordered a further 9 A380s and stated that Airbus had "demonstrated to our satisfaction that the engineering design for the A380 is sound [and that] it has performed well in flight and certification tests and the delays in its delivery have been caused more by production, rather than technical, issues.
On 3 October 2006, upon completion of a review of the A380 program, the then CEO of Airbus, Christian Streiff, announced a third delay, pushing the first delivery for Singapore Airlines to October 2007, to be followed by 13 deliveries in 2008, 25 in 2009, and the full production rate of 45 aircraft per year in 2010. The delay also increased the earnings shortfall projected by Airbus through 2010 to €4.8 billion. The customer with the largest A380 order, Emirates, saw its first delivery pushed back to August 2008 and said as a result that it was considering scaling back its order, potentially in favour of the rival Boeing 747-8. However, Emirates never scaled back the order but placed additional orders for A380s in 2007. Virgin Atlantic deferred its deliveries by four years, to 2013. The third delay was followed by the first cancellations to hit the A380 programme. On 7 November 2006 FedEx cancelled its order for 10 A380F freighters in favour of 15 Boeing 777 Freighters.In March 2007, the last remaining customer for the A380F, UPS, announced the cancellation of its order. Airbus suspended work on the freighter version in order to concentrate on delivering the passenger version, but said the freighter remained on offer.As of March 2007, Airbus estimated a 2014 entry into service for the A380F.